Client | Project Date | Project Status | SUEZ OIL COMPANY | 2019/2022 | Ongoing |
---|---|---|
Project Activities: Contract NO. OP/29/2019 Provision of qualified technical manpower (Permanent/On Call) | ||
Burllus Gas company | 2020 | Completed |
Project Activities: Material supplies and fitting | ||
Khalda petroleum company | 2020 | Completed |
Project Activities: Material supplies and Fitting | ||
PETROSAFE CO. | 2019 | Completed |
Project Activities: Design, Engineering and Execution Supervision for firefighting and detection system | ||
EXPRO- Sea Dragon/Petro Disouq Petroleum Co | 2019/2020 | Completed |
Project Activities: Pre commissioning, Commissioning and Operations for CPF SDX project | ||
EPROM/ Chevron | 2019 | Completed |
Project Activities: Piping Replacement project at Chevron oil factory by PVC | ||
PETROSANNAN PETROLEUM CO. | 2019 | Completed |
Project Activities: As-Built Engineering for compressor station at AES-E6 | ||
AMOC | 2019 | Completed |
Project Activities: Maintenance and engineering for 27 electrical Transformers from 1600 KVA 2.5 up to 6000 mega Volt. | ||
EXPRO/ BAPETCO CO. | 2019 | Completed |
Project Activities: Manpower Supply for Instrument Technicians at SITTRA fields | ||
Client | Project Date | Project Status | PETROTARD-AGROUD | 2018/2019 | Completed |
---|---|---|
Project Activities: Mechanical maintenance and electrical appliances for direct heating units - oven | ||
EMC/ BURLLUS GAS COMPANY | 2018/2021 | Completed |
Project Activities: Maintenance contract for supply Crew (welders, grinders, Fitter, etc. for welding tanks and piping repairs) | ||
Khalda petroleum company | 2018/2019 | Completed |
Project Activities: Instrument and mechanical fittings Supply | ||
SUCO OIL COMPANY | 2019 | Completed |
Project Activities: MANPOWER SUPPLY FOR GAS LIFT COMPRESSOR SHUT DOWN ACTIVITIES | ||
PETROTRADE | 2019 | Completed |
Project Activities: Earthing and lightening system for AGROUD | ||
EPROM | 2018 | Completed |
Project Activities: General mechanical maintenance, fabrication, electrical work for Chevron company. | ||
PHARAONIC PETROLEUM COMPANY | 2018 | Completed |
Project Activities: Supply and fabrication Two Load banks 400 KW installation and commissioning and start up | ||
EMC /QARUN PETROLEUM CO. | 2018/2019 | Completed |
Project Activities: Manpower supply contract for Inspection Engineers | ||
EMC/PETRO SHAHD | 2017 | Completed |
Project Activities: ENGINEERING FOR ELZAHRAA PUMP STATION | ||
Client | Project Date | Project Status | EAST ZEIT PETROLEUM | 2017 | Completed |
---|---|---|
Project Activities: Fire and gas detection project, EPC | ||
EMC/ PHPC | 2017 | Completed |
Project Activities: Commissioning Services and rented calibration tools | ||
PETROJET/ MIDOR | 2017 | Completed |
Project Activities: Static and dynamic Stress Analysis Study review and hydraulic study for tank farms | ||
ERC/GS Company | 2017 | Completed |
Project Activities: Materials supplies, piping, fitting, machines | ||
EAST ZEIT PETROLEUM | 2017 | Completed |
Project Activities: Gas compressors blow down and pressure relief study and Fuel gas system. -New Flare gas system design study | ||
AMAPETCO/ PICO ENERGY | 2017 | Completed |
Project Activities: E&I Punch list, commissioning, start up and troubleshooting for Platforms C &B | ||
SDX/Sea Dragon Egypt | 2017 | Completed |
Project Activities: Hydraulic sizing calculation study, Wells flow line and export gas line | ||
SAINT GOBAIN EGYPT GLASS | 2017 | Completed |
Project Activities: As-Built Shop drawings, General Arrangement Drawings and CO2 System Piping Drawings Using 3D Model for 22 Rooms | ||
Sub contract/FANAR | 2016 | Completed |
Project Activities: Plant basic and detailed engineering firefighting system. | ||
Client | Project Date | Project Status | SAINT GOBAIN EGYPT GLASS | 2017 | Completed |
---|---|---|
Project Activities: Fire water pump room and fire water network piping system, Modification and upgrading systems | ||
PICO Energy | 2017 | Completed |
Project Activities: Project Activities: Commissioning Management and supply E&I testing and calibration tools for Al Amal Platform C | ||
Suez Co. cement plant | 2017 | Completed |
Project Activities: Firefighting system for Storage Tanks | ||
Aquaterra Energy | 2017 | Completed |
Project Activities: Pre-commissioning works for Al Amal C Platform | ||
Saint Gobain Egypt glass | 2017 | Completed |
Project Activities: Factory unit upgrade detailed piping design | ||
BADR PETROLEUM COMPANY (BAPETCO) | 2021-2023 | Ongoing |
Project Activities: Contract NO -1942-2020-OM the provision of troubleshooting, inspection & Repair for transformers | ||
AMAL PETROLUM COMPANY | 2021-2022 | Ongoing |
Project Activities: UPGRADING AND MAINTENANCE FOR HVAC SYSTEM AT FIELD SITES | ||
Tanmia/ EXPRO | 2021/2022 | Ongoing |
Project Activities: Contract for supply commissioning services Operations at EPF facility at Abou El Ghardiq | ||
Petrojet ANUPC | 2021/2022 | Ongoing |
Project Activities: Supply and Install fire alarm Systems South branch Asyut- Petrojet CAMP | ||
Client | Project Date | Project Status | Khalda petroleum Company | 2022 | Ongoing |
---|---|---|
Project Activities: Project Activities: Fire Fighting Design, Supply and install FM-200/C02 Suppression System for Salam and Tarek Gas Plants Contract | ||
Air Liquide Company | 2022 | Ongoing |
Project Activities: Firefighting Project for Abo Qir-Alex site | ||
Suez oil company | 2022 | Ongoing |
Project Activities: Design, Supply and install Zeit-Bay Addressable Fire Alarm Network to cover the Camp Area, Administration Buildings, Workshop Buildings and Warehouses Contact | ||
BADR PETROLEUM COMPANY (BAPETCO) | 2021-2022 | Completed |
Project Activities: PROVISION OF UPGRADE FOR THE EQUIPMENTS (CONDENSER & EVAPORATOR) UNITS, PIPING WITH ITS INSULATION AND CONTROL- CONTRACT NO. 1937/2020/OM | ||
(ANOPC)- ENPPI | 2022 | Ongoing |
Project Activities: Supply tubing and Valves for ASSIUT HYDROCRACKING COMPLEX PROJECT (ANOPC)-ENPPI | ||
MIDOR-ENPPI | 2021 | Completed |
Project Activities: Supply tubing and Valves for ASSIUT HYDROCRACKING COMPLEX PROJECT (ANOPC)-ENPPI | ||
MIDOR-ENPPI | 2021 | Completed |
Project Activities: Supply tubing and Valves MIDOR REFINARY-AMRYA FREE ZONE -ENPPI | ||
KHALDA PETROLEUM Company | 2022 | Ongoing |
Project Activities: QASR CAMP KITCHEN | ||