CALL US :  +20227039000
             FAX: +20227039505

  Street 270, Building 5, 4th sector, in front of GUPCO, Maadi, Cairo, Egypt
               P.O.Box: 477, P.C: 116, Mina Al Fahl, Sultanate of Oman


EGYPTO Clients & Projects





Project Date: 2019/2022 / Project Status: Ongoing

contract NO. OP/29/2019 Provision of qualified technical manpower (Permanent/On Call)




Project Date: 2020 / Project Status: Completed

Material supplies and fitting




Project Date: 2020 / Project Status: Completed

Material supplies and Fitting




Project Date: 2019 / Project Status: Completed

Design, Engineering and Execution Supervision for firefighting and detection system




Project Date: 2019/2020 / Project Status: Ongoing

Pre commissioning, Commissioning and Operations for CPF SDX project




Project Date: 2019 / Project Status: Completed

Piping Replacement project at Chevron oil factory by PVC




Project Date: 2019 / Project Status: Completed

As-Built Engineering for compressor station at AES-E6




Project Date: 2019 / Project Status: Completed

Maintenance and engineering for 27 electrical Transformers from 1600 KVA 2.5 up to 6000 mega Volt.




Project Date: 2019 / Project Status: Completed

Manpower Supply for Instrument Technicians at SITTRA fields




Project Date: 2018/2019 / Project Status: Completed

Mechanical maintenance and electrical appliances for direct heating units - oven




Project Date: 2018/2021 / Project Status: Ongoing

Maintenance contract for supply Crew (welders, grinders, Fitter, etc. for welding tanks and piping repairs)




Project Date: 2018/2019 / Project Status: Completed

Instrument and mechanical fittings Supply




Project Date: 2019 / Project Status: Completed

MANPOWER SUPPLY FOR GAS LIFT COMPRESSOR SHUT DOWN ACTIVITIES




Project Date: 2019 / Project Status: Completed

Earthing and lightening system for AGROUD




Project Date: 2018 / Project Status: Completed

General mechanical maintenance, fabrication, electrical work for Chevron company.




Project Date: 2018 / Project Status: Completed

Manpower supply for electrical technicians and cathodic protection Engineer




Project Date: 2018 / Project Status: Completed

Supply and fabrication Two Load banks 400 KW installation and commissioning and start up




Project Date: 2018 / Project Status: Completed

Chevron oil factory piping and mechanical engineering and Construction services




Project Date: 2018/2019 / Project Status: Ongoing

Manpower supply contract for Inspection Engineers




Project Date: 12/2017 / Project Status: Ongoing

ENGINEERING FOR ELZAHRAA PUMP STATION




Project Date: 10/2017 / Project Status: Completed

Fire and gas detection project, EPC




Project Date: 10/2017 / Project Status: Completed

Commissioning Services and rented calibration tools




Project Date: 08/2017 / Project Status: Ongoing

Static and dynamic Stress Analysis Study review and hydraulic study for tank farms




Project Date: June/July 2017 / Project Status: Ongoing

Materials supplies, piping, fitting, machines




Project Date: 07/2017 / Project Status: Completed

Gas compressors blow down and pressure relief study and Fuel gas system. -New Flare gas system design study




Project Date: 07/2017 / Project Status: Completed

E&I Punch list, commissioning, start up and troubleshooting for Platforms C &B




Project Date: 2017 / Project Status: Completed

Hydraulic sizing calculation study, Wells flow line and export gas line




Project Date: 03/2017 / Project Status: Completed

As-Built Shop drawings, General Arrangement Drawings and CO2 System Piping Drawings Using 3D Model for 22 Rooms




Project Date: 2016 / Project Status: Completed

Plant basic and detailed engineering firefighting system.




Project Date: 2017 / Project Status: Completed

Fire water pump room and fire water network piping system, Modification and upgrading systems




Project Date: 05/2017 / Project Status: Ongoing

Commissioning Management and supply E&I testing and calibration tools for Al Amal Platform C




Project Date: 2017 / Project Status: Completed

Firefighting system for Storage Tanks




Project Date: 2017 / Project Status: Completed

Pre-commissioning works for Al Amal C Platform




Project Date: 2017 / Project Status: Completed

Factory unit upgrade detailed piping design